Why link an element to a control intervention?
You can link one or several elements to a control intervention when you want to schedule a control intervention on an element.
How do I link an element to a control intervention?
To link an element to a control intervention, simply:
Select a single site
Click on "Elements"
Filter for the element
Click on "Control interventions" then "Add"
Choose the intervention — two options:
How do I link several elements to a control intervention?
To link several elements to a control intervention, simply:
Select a single site
Click on "Elements"
Filter the elements
Select the elements
Click on "Bulk actions"
Click on "Link to a control intervention"
Choose the intervention — two options: